Hot Products
Process Flow Overview:
Loading -- Spray Degreasing -- Spray Rinsing -- Spray Phosphating -- Spray Rinsing -- Drying -- Water Drying and Cooling -- Dual-station Automatic Powder Coating Chamber -- Drying -- Cooling -- Unloading
Please let us know your detailed requirement, will design accordingly for you.
Product Details
The Main Equipment Includes:
Pre-treatment system, powder coating recovery equipment, drying tunnel, heating system, overhead conveyor chain, and electrical control system.
Project Performance:
The production coating adopts advanced domestic and international coating technologies. Upon completion, it will demonstrate our factory's high level of design, manufacturing, installation, debugging, and comprehensive after-sales service. The production line will be rationally configured, reliable, energy-efficient, and highly efficient, reducing labor intensity and improving the working environment. The final product coating quality will meet or exceed industry standards.
Basic Design Connditions' Example:
Workpiece Name: Metal Products
Effective Working Time: 22days/month, 8hours/day
Maximum Workpiece Size and Weight: Size: 3000*800*2000mm L*W*H, Weight: ≤150kg/piece(Max)
Hanging Spacing: 600mm; Center Distance: 300mm
Hanging Method: Double-point single-piece hanging
Line Speed: 2m/min(0.3-3m/min continuoulsy adjustable)
Drying Conditions: 180-200°C/20-30min
Powder Supply: 380V, 3phase, 50Hz
Factory Conditions: Refer to the layout diagram(mm)